Client Login

Past Projects
PROCESS GAS BOILER and STEAM DRUM
 
SCOPE OF PROJECT
5K Logistics successfully managed the transport of a new-engineered combination of a Process Gas Boiler and its companion Steam Drum as a completed “piggyback” unit via rail. Trans-loaded from rail to goldhofer and placed on-site at pad.
FMC NVOCC #016568NF    |    IAC #NE0904004